三坐标测量机验收办法 作者: 来源: 时间:2017-11-02 点击次数:次

SANZUOBIAOCELIANGJIYANSHOUBANFAAcceptance Test for CMM

ZAIYONGHUXIANCHANGDIAOSHIHOUDECELIANGJIYANSHOUFANGFA,GENJUQIPEIZHIDEBUTONG,FENBIEYIJUXIALIEBIAOZHUNZHIXING:

十大棋牌游戏排行榜GB/T16857.2-2006《ZUOBIAOCELIANGJIDEYANSHOUJIANCEHEFUJIANJIANCE-DI2 BUFEN:YONGYUCELIANGCHICUNDEZUOBIAOCELIANGJI》(DENGTONGISO 10360-2:2001);

十大棋牌游戏排行榜Theacceptance tests on site by customer should follow this standard:

GB/T16857.2-2006, Acceptance and reverification tests for coordinate measuringmachines

十大棋牌游戏排行榜part2: CMMs used for measuring size (ISO 10360-2:2001, IDT).


1JIANCEXIANGMU Tests Item:

1.1WAIGUANJIGEBUFENDEXIANGHUZUOYONGAppearance and function for each section

1.2JISUANJI、DAYINJIJIRUANJIANGONGNENG Function of computer, printer and software

1.3TANCEWUCHA(P)Probing Error

1.4SHIZHIWUCHA(E)Error of indication for size measurement

2JIANCEFANGFATests method:

十大棋牌游戏排行榜JIANCEQIANCELIANGJIYINGTONGDIAN24 XIAOSHIYISHANG。

TheCMM should keep the status of „power on‟ over 24 hours.

十大棋牌游戏排行榜2.1MUCEHECAOZUOSHIYANJIANCHAWAIGUANJIGEBUFENDEXIANGHUZUOYONG。

十大棋牌游戏排行榜Checkby eye to confirm the appearance is OK and operate the CMM to confirm each

sectioncan work well.

2.2YONGXIANGYINGDEZHENDUANCHENGXUJIANCHAJISUANJI、DAYINJIJIRUANJIANGONGNENG。

Checkthe function of computer, printer and software by relevant analytic program.

十大棋牌游戏排行榜2.3TANCEWUCHA(P)DEJIANCE Test Probing Error (P):

十大棋牌游戏排行榜ZAIZHIJINGBUXIAOYU10mm BUDAYU50mm DEJIANCEQIUSHANG,YONGZHANGDUFUHECHANGSHANGGUIDINGDETANZHEN,SUIYIXUANZETANZHENDEFANGWEI,CHUCE25 GEDIAN,GEDIANZAIBANQIUSHANGDEFENBUJINLIANGJUNYUN,YONGQUANBU25 GECELIANGZHIJISUANCHUZUIXIAOERCHENGQIUDEZHONGXIN,BINGJISUANCHUGEDIANDEJINGXIANGJULI,ZUIDAJINGXIANGJULIYUZUIXIAOJINGXIANGJULIZHICHAJIWEITANCEWUCHA(P)。YINGMANZUJIDINGDEMPEP ZHI。

Aplaced test sphere, which has a diameter not less than 10 mm and not greaterthan 50 mm, is measured with 25 equally distributed points by a tip whoselength is stated by manufacturer. These 25 stochastic points should locate onarbitrary direction. Use all 25 measurements to compute the Least Squareassociated sphere. Calculate the distance between each of the 25 measurementsand the sphere center in the radial direction. The range of the 25 distances isMPEP. The actual measurement on site must be within the stated MPEP.

十大棋牌游戏排行榜2.4ZHANGDUCELIANGDESHIZHIWUCHA(E)DEJIANCE

十大棋牌游戏排行榜TestError of indication for size measurement(E):

2.4.1ZAIZUOBIAOCELIANGJIDEGONGZUOKONGJIANRENXUANQIGEFANGWEI,MEIGEFANGWEICE5 GECHICUNDELIANGKUAI,MEIGECHICUNDELIANGKUAICELIANGSANCI。JI35 ZUCELIANGZHANGDUZONGCELIANGCISHUWEI105 CI。JISUAN105 GEZHANGDUCELIANGDEWUCHAZHI△ L,YINGMANZUJIDINGDEZUOBIAOCELIANGJIZHANGDUCELIANGDESHIZHIWUCHAMPEEZHI。

十大棋牌游戏排行榜Choose7 different positions within the CMM measuring volume and measure a set of 5sizes gauge block at each position. Each size is measured 3 times, so can get atotal of 105 measurements in 35 groups. Calculate △ L-the error of this 105length measurements. All of them must be within the specified MPEE.

2.4.235 ZUCELIANGZHANGDUZHONG,YUNXUZUIDUOYOU5 ZU,QISANCIZHONGFUCELIANGZHONGYOUYICICHAOCHUGUIDINGDEMPEE ZHI,DUIMEIGECHAOCHADECELIANGZHANGDU,YINGZAIXIANGYINGDEFANGWEIZAICE10 CI,RU10 CIFUCEDEDAODESUOYOUZHANGDUCELIANGDEWUCHAZHI△ L JUNZAIMPEE ZHINEI,ZESHIZHIWUCHA(E)DEJIANCEBEITONGGUO。

十大棋牌游戏排行榜Inthe 35 groups of data, 5 groups of data at most can be permitted to have 1 ofthe 3 measurements over the stated MPEE value. If such case occurs, for eachoversized measurement, it should be measured again at the same position for 10more times. If all of the new 10 measurements‟ errors of △ L are within MPEEvalue, the verification for E is passed.

2.4.3SHANGSHUCELIANGZHONGTANZHENZHANGDUYINGFUHECHANGSHANGGUIDING,LIANGKUAIZUIDUANZHANGDUBUYINGDAYU30mm;LIANGKUAIZUIDAZHANGDUZHISHAOSHIZUOBIAOCELIANGJIGONGZUOKONGJIANDUIJIAOXIANZUIDAZHANGDUDE66%,RUCHAOGUO1m SHI,ZEYONG1m LIANGKUAI。

十大棋牌游戏排行榜Thelength of probe tip above-mentioned is stated by manufacturer. The minimumlength of gauge block should be shorter than 30mm and the maximum length shouldbe longer than 66% of the maximum cater-corner length of CMM‟s working volume.The maximum length of block should be 1m if the value calculated is longer than1m.

3YANSHOUJIAOJIEAcceptance:

十大棋牌游戏排行榜3.1YIJIANCEJILU、ZHUANGXIANGDANHEHETONGWEIZHUN,SHUANGFANGJIAOJIE、YANSHOU。YANSHOUHEGE,SHUANGFANGDAIBIAOZAIYANSHOUBAOGAOSHANGQIANZI。RUOYOUYIYI,XIESHANGJIEJUE。YILIUWENTIKEQIANSHUBEIWANGLU,YIBIANFUWU、JIEJUE.

十大棋牌游戏排行榜Buyershould check and accept the CMM according to the tests report, packing list

十大棋牌游戏排行榜andcontract. If tests result is OK, the representatives of both sides should signon the

AcceptanceReport. If disagreements occur, settlement through amicable negotiation

betweenthe two parties is advocated. Any unsettled problem should be recorded in

memorandumto help both sides to look for further settlement.